Set up a TOPCon solar cell line, with wafers and spares lined up.
From line design and tool selection to commissioning, plus the wafer supply, consumables and spare parts a new cell line needs from day one.
Configured around the project, not a fixed package.
Every mandate begins with technical and commercial requirements. Individual machinery supply is available independently of a full turnkey engagement.
- 01Line design: capacity, cell technology and format (M10R / G12R)
- 02Tool selection: texturing, diffusion, LPCVD, PECVD, lasers, printing, firing, testing
- 03Supplier negotiation, inspection and import coordination
- 04Utilities: gases, chemicals, UPW, exhaust and clean room
- 05Installation, commissioning and operator training
- 06Wafer supply and recurring consumables
- 07Spare-parts programme for uptime
Equipment condition, inspection method, warranty, after-sales support, delivery schedule, and acceptance criteria are confirmed in the final supplier and JRST proposal. Manufacturer-backed warranty terms are passed through according to the selected equipment package.
Solar Cell Plant Setup: FAQs
What are the main process steps in a TOPCon solar cell line?
Broadly: wafer texturing and cleaning, boron diffusion for the front emitter, rear-side etching, deposition of the tunnel oxide and doped polysilicon layer (by LPCVD or PECVD), annealing, front and rear passivation and anti-reflection coatings, laser steps where the design needs them, screen printing of metal contacts, firing, and then testing and sorting by efficiency. Exact tool choices depend on the cell design and the target capacity.
How do I start planning a solar cell plant in India?
Decide in order, because each choice limits the next: cell technology (most new Indian lines are TOPCon), wafer format (M10R, G12R or G12), target capacity, then the equipment list, utilities and building. Get full-line quotations from more than one equipment supplier for your chosen capacity, and add working capital for ramp-up, when yields are lowest.
Which utilities does a solar cell line need?
Very stable power, ultra-pure water, process gases and chemicals, exhaust and scrubbing, effluent treatment, and clean-room areas for the sensitive steps. Utilities are often a large share of the project and take as long to design as the process tools, so they are planned alongside the line from the start.
Does a new cell plant need ALMM listing and BIS certification?
For most Indian projects, yes. ALMM List-II for solar cells has applied since 1 June 2026, and domestic-content (DCR) schemes need cells made in India. Plan BIS certification and ALMM enlistment as part of the project timeline, not after commissioning. Check current MNRE notifications for the exact rules that apply to your buyers.
Can JRST set up a solar cell line and supply wafers and spares afterwards?
Yes. JRST Technology, led by Co-Founder & Director Mohammed Saif Zaveri, supports line design, tool selection, supplier negotiation, utilities, commissioning and operator training, then the wafers, consumables and spare parts the line needs to keep running. Cell-line spares and wafers can be requested on the JRST Buyer Portal. Scope and timelines are confirmed in each proposal.
Begin with the requirement, not a catalogue.